Driveway Gravel Calculator
Base and top layers for a driveway that lasts - cubic yards and tons.
Driveways need real depth: 4 inches minimum, compacted in layers, and 6 to 8 inches for heavy vehicles or soft ground. This page is preset to 4 inches with a 10% margin - compacting eats volume. A common build-up is coarse base stone, a #57 middle layer, then a finer top layer.
Includes your waste allowance. Round up when ordering - running short mid-project costs more than a little extra.
Quick answers: common areas
| Area | Bulk | Bagged (0.5 cu ft bag) |
|---|---|---|
| 100 sq ft at 4″ | 1.36 cu yd | 74 bags |
| 200 sq ft at 4″ | 2.72 cu yd | 147 bags |
| 500 sq ft at 4″ | 6.79 cu yd | 367 bags |
| 1,000 sq ft at 4″ | 13.58 cu yd | 734 bags |
Related
Frequently asked questions
How much gravel do I need?
Multiply length x width (feet) x depth (inches) and divide by 12 for cubic feet, then by 27 for cubic yards. A 20x10 ft area at 2 inches deep needs about 1.23 cubic yards, roughly 1.7 tons.
How many tons of gravel are in a cubic yard?
About 1.4 tons for typical crushed stone. Lighter decorative rock can be closer to 1.2 tons; wet or dense stone up to 1.7 tons per yard.
How much area does a ton of gravel cover?
At 2 inches deep, one ton covers roughly 115 square feet. At 4 inches, about 58 square feet.
How many 50 lb bags of gravel make a yard?
A 0.5 cu ft (50 lb) bag means 54 bags per cubic yard. Bulk delivery is almost always cheaper at that scale.